翻訳と辞書 |
USNS Benjamin Isherwood (T-AO-191) : ウィキペディア英語版 | USNS Benjamin Isherwood (T-AO-191)
United States Naval Ship USNS ''Benjamin Isherwood'' (T-AO-191) was a fleet replenishment oiler of the United States Navy. She was never completed. ==Construction== ''Benjamin Isherwood'', the fifth ''Henry J. Kaiser'' class ship, was laid down by the Pennsylvania Shipbuilding Company in Philadelphia, Pennsylvania, on 12 July 1986. Her construction encountered numerous problems. Although she was launched on 15 August 1988, her construction contract with Pennsylvania Shipbuilding was cancelled on 31 August 1989. Along with her unfinished sister ship , the incomplete ''Benjamin Isherwood'' was towed to the Philadelphia Naval Shipyard in Philadelphia on 27 October 1989 for lay-up. A new contract to complete ''Benjamin Isherwood'' was awarded on 16 November 1989 to the Tampa Shipbuilding Company of Tampa, Florida. She was towed from Philadelphia to Tampa. She was christened there on 7 December 1991. However, construction problems continued, and that contract also was cancelled, on 15 August 1993, when the ship was 95.3 percent〔 〕 complete. Cost overruns had run into the millions of U.S. dollars.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「USNS Benjamin Isherwood (T-AO-191)」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|